The roof has now been finished and the chimney has been started. They are now about to begin the stucco on the outside of the house as they placed all the supports and scaffolding today. Inside the house there was alot accomplished as air and heating ducts were all placed, cans for lighting were hung, fireplace was installed, and electrical wiring has been started. Of course there were a few mistakes made as to be expected such as placing light switch boxes in wrong places and adding air ducts to our unfinished storage, but hey we will take it since it was part of the package and did not cost any extra. now if we ever finish that room we don't have to worry about running air to it. Next week they will run all the low voltage wiring for the phone, tv, internet, and so forth and continue stucco prep and work. Jess and I have been busy buying bedroom sets for the boys and appliances. We have been super lucky as the things we have been wanting have come on sale at the right time. We got a barely used second fridge for half price, a deep freeze over $200 off and our main fridge $800 dollars off.
Here is the house completely shingled.
This is looking at the front of the house from the driveway.
This is the fireplace in the living room
All the electrical wiring and air conditioning pipes.
This is niche for the china hutch in the formal dining room.
This is the back of the house looking at the master bedroom.
This is looking at the back of the house.
Looks good. It is going to be a beautiful home. So jealous.
ReplyDeletecompleted the majority of the electrical wiring with the exception of the installation of the autopilot disconnect switchElectrical Wiring
ReplyDelete