Friday, May 27, 2011

Tile

This week the painters are finishing up although there is still a lot of touch up to do. The guest bath, and the two baths upstairs had the cultured marble counter tops installed. We had to use some extra kitchen counter top for the powder bath because the granite I had was an inch or so too short, oh well i will just have to build something in the garage and use it there. They have now started to tile as the two upstairs bathrooms floor have been tiled minus the grout. They are also now working on the tile in the master bath as well. This is exciting as we continue to get closer to a move in date. The outside stone has arrived and is waiting to be put up.

This is the travertine tile that is going in the master bath.


Tile in kids bath upstairs.


Kids bath upstairs.


The other kids bath upstairs. Same tile as the other bathroom.

Cultured marble counter top in the guest bath. This is the same as the 2 kids baths upstairs.


Deer in our back yard.

There were 2 deer that I watched in our future backyard.

1 comment: