framing part 3

The framing is almost done. They just need to finish the roof and fix some of the mistakes that have been made such as forgetting a door for a bedroom. Always good to have a door for a bedroom unless you want to go through another room, into the bathroom, and then finally into the bedroom. Everything is looking awesome we are so excited. They should finish framing the roof next week and start applying the walls on the outside of the house.


 Here is the house framed minus the roof.

 This is looking from the family room into the front entry and up to the second level where the bridge is located.

This is looking at the arch over the entrance to the formal dining.
 
 This is looking down from the juliet balcony to the fireplace down below.

This is looking at the bridge and the top of the stairs from juliet balcony.