Friday, February 18, 2011

roof started

The house is coming along very quickly. We have been shocked at how quickly things have gone. The outside is completely framed (except the chimney) and the shingles are going on right now.  The windows are all in and the all the exterior doors are on minus the front ones which don't go on until the house can be secured due to high theft of front doors during construction. Inside the house things are going up nicely all the plumbing has been run as well as gas lines. We even have 3 tubs installed. It was a good thing we walk the house frequently since the plumbers ran a bunch of tubing right where the laundry chute was supposed to be.(would have helped if the framers would not have forgotten to put the chute in). They have now moved the tubes and we are awaiting the chute to be placed. We have spent 4 hours at the house this week going over the electrical and low volt wiring.


 This is looking at the front of the house from where the driveway will be.


 This is looking at the 2 garages.


Here is the front of the house with the roof decking on and shingles started.


These are the four large living room windows.

Here is one of the kids bathtubs.

Looking up at the roof in progress. Nice tall attic space.


Another tub with one of the water control panels behind it.

This is looking from the bridge down at the front entry.


Here is the down stairs water control panel.

No comments:

Post a Comment